Montreal Sealcoating

Parking lot sealcoating in Montreal

A parking lot takes more traffic, more salt and more plowing than any driveway. Sealcoating protects it, makes it look cared for and puts off a costly repave. We work with businesses, condo boards and property managers across Montreal and nearby.
  • Registered Quebec business (NEQ)
  • Fully insured
  • 5 years in business
Freshly sealed and striped parking lot in front of a commercial building

Get your quote

We only use your details to reply to your request. Privacy policy

Why property managers seal their lots

  • It puts off repaving

    Repaving is the big expense. Sealing every few years keeps the asphalt going much longer before you get there.

  • It looks cared for

    Customers and tenants notice a clean, black lot with crisp lines. They notice a faded, cracked one too.

  • Fewer hazards

    Sealed cracks and patched potholes mean fewer trips, puddles and complaints.

  • Easier to budget

    Regular sealing is a small, planned cost instead of a large surprise.

Parking lot sealing without shutting you down

We plan the work around your hours, your tenants and your deliveries. Bigger lots get done in sections, so part of the lot stays open while the rest cures. You'll know the schedule before we start.

What's included

  1. 1

    Clean

    We sweep and blow the lot clean and treat oil stains so the sealer bonds.

  2. 2

    Repair

    Cracks get sealed and potholes get patched before any sealer goes down.

  3. 3

    Sealcoat

    A commercial sealer goes on in even coats across the whole lot, one section at a time.

  4. 4

    Restripe

    Once the sealer has cured, we paint fresh lines, arrows and markings.

More on each part: crack sealing, asphalt repair and line striping.

When to sealcoat a parking lot

Most lots need it every two to three years. Busy lots and lots that see a lot of salt may need it sooner. Signs it's time: the asphalt has turned grey, small cracks are spreading, loose stones are showing and water soaks in instead of running off.

The work happens on warm, dry days from late spring to early fall, so it helps to plan before summer. Request a quote and we'll set up a time to look at the lot.

Parking lot sealcoating questions

How long will the lot be closed?

Each section needs cars off for about 72 hours (3 days). On larger lots we work in sections so part of the lot stays open while the rest cures.

Do you work with condo boards and property managers?

Yes. We look at the lot, answer the board or manager's questions and give you a quote you can bring to a meeting.

Can you restripe the lot at the same time?

Yes. Fresh lines go down once the sealer has cured, so the lot is done in one project. See line striping.

Do you seal driveways too?

Yes. See driveway sealcoating for homes in Montreal and nearby.

Get a quote for your parking lot