Parking lot paving in Pointe-Claire and Montreal
- Registered Quebec business (NEQ)
- Fully insured
- 5 years in business

New lots, repaves and resurfacing
New parking lots
Built from bare ground: excavation, grading, a compacted base, drainage and new asphalt.
Full repaves
The old asphalt comes out, the base gets repaired where it has failed, and new asphalt goes down.
Resurfacing
When the base is still sound, a new layer of asphalt over the old one can be enough.
How we pave a parking lot
- 1
Plan
We measure the lot, check slopes and drainage and plan the layout with you.
- 2
Excavate and grade
Old asphalt and soft soil come out, and the ground is shaped so water drains away.
- 3
Build the base
Crushed stone goes down in layers, each one compacted.
- 4
Pave
Hot asphalt is laid and rolled smooth and tight.
- 5
Stripe
Once the asphalt has set, we paint stalls, arrows and markings.
The last step is the lines. More on line striping.
Built for freeze and thaw
In Quebec the ground freezes deep. A thin base heaves and cracks within a few winters, and water that sits on the surface finds its way in. The base and the drainage are where a parking lot lasts or fails, so that's where most of the work goes.
Paving, repair or sealcoating?
Not every tired lot needs new asphalt. Here's how we decide:
- Damage in a few spots: asphalt repair fixes them for much less.
- Sound surface, faded and cracked on top: parking lot sealcoating protects it for years.
- Failing base, damage everywhere: that's when paving is worth it.
We'll look at the lot with you and tell you plainly which one it needs.
Paving in Pointe-Claire and beyond
We pave parking lots in Pointe-Claire and across the West Island, and anywhere else in the Montreal area. Request a quote and we'll set up a time to look at your lot.
Parking lot paving questions
How long does it take to pave a parking lot?
It depends on the size of the lot and how much base work it needs. A small lot can take a few days. You get the schedule with your quote.
When should a new parking lot be sealcoated?
After the asphalt has cured, usually six months to a year after paving. Then every two to three years. See parking lot sealcoating.
Can part of the lot stay open during paving?
Often, yes. Larger lots can be paved in phases so some parking stays available. We plan that with you before we start.
Related services
- Parking lot sealcoatingCleaning, crack filling and sealcoating for commercial and residential parking lots.Learn more →
- Line stripingParking stalls, arrows, fire lanes and accessible spaces painted crisp and easy to read.Learn more →
- Asphalt repairPotholes, sunken spots and crumbling edges patched, so the surface is solid before it gets sealed.Learn more →
